After 42 years in the same Ashford home, Shelagh Varley wanted to replace a dilapidated bathroom that was around 20 years old. The priority was to modernise the room, future-proof it and gain a shower where others had said this was not possible.
The project covered end-to-end design, supply and installation. The scope included a full rip-out, wall repairs, tiling, plastering, painting and decorating, plumbing and flooring, with tiles, bathroom furniture, radiators, showers and taps, and lighting specified for the new space.