Contemporary bathroom furniture installed in Kennington Ashford

Modern Bathroom Transformation in Ashford

Invicta Bathrooms
Customer:
Nigel Rees
Location:
Kent
Budget:
£15,000
Total Cost:
£13,500
Project Duration:
2 weeks
Bathroom / Furniture Range Used:
Alcala

Final Bathroom Specifications

Bathroom / Furniture Range Used:
Alcala

About The Project

This bathroom renovation in Kennington, Ashford, focused on modernising the room while making the layout work more effectively for the available space. At the survey stage, the client’s key priority was to reconfigure the room so it felt better planned, more practical and better suited to everyday use.

A major part of the project involved relocating the toilet to the opposite side of the room. This required careful consideration of the soil stack and plumbing route, ensuring the new position could be achieved properly without compromising the long-term performance of the bathroom.

The finished scheme included new bathroom furniture, full wall panels, upgraded plumbing, shower and tap fittings, lighting, a pump, an electric towel rail and associated electrical improvements. The result was a complete update that gave the client a cleaner, more modern and more functional bathroom space.

This is what the bathroom looked like before

The Process & The Bathroom Design & Build In Progress

The project was delivered over 2 weeks, with the work carefully sequenced to keep each stage moving in the right order. The initial phase involved rip-out and first-fix plumbing, allowing the new layout to be prepared and the relocated toilet position to be planned around the required waste connection.

Once the plumbing preparation was underway, the electrician completed the first-fix wiring, including the new electrical requirements for the pump and electric towel rail. A new fuse board was also required as part of the wider electrical works, helping ensure the installation was completed safely and to the right standard.

The plumber then returned to install the bath, fit the full panels and complete the second-fix plumbing. The electrician followed with a return visit to liven up the works and complete the electrical side of the installation.

A supplier issue caused a delay during the project, but this was managed without becoming a major problem. The customer was pleased with the professionalism shown by the team throughout, particularly the organised approach and standard of workmanship from start to finish.

Here you can see the work involved and what the space looked like as things progressed.

Download Our Brochure.

View our Ranges

The Results

The completed bathroom in Kennington, Ashford, gave the client a fully modernised space with a more practical layout and a cleaner, more contemporary finish. By relocating the toilet, upgrading the plumbing and electrics, and installing new panels, fittings and lighting, the room became better suited to the client’s needs and more enjoyable to use.

  • Reconfigured bathroom layout to make better use of the room size
  • Toilet relocated to the opposite side of the room
  • Plumbing adapted to suit the new soil stack requirements
  • Full wall panels installed for a clean, modern finish
  • New shower and tap fittings added
  • New pump and electric towel rail included
  • Lighting and electrical works upgraded
  • New fuse board installed as part of the project
  • Finished bathroom described by the customer as outstanding
Contemporary bathroom furniture installed in Kennington Ashford

“I can wholeheartedly recommend them as a first-rate company.

Every aspect of the project was excellent, as was the finished bathroom, which was outstanding.

There was great attention to detail throughout, and everything was finished to the highest standards.”

Inspired by this project? Contact us today to start planning your own transformation.

Nigel Rees

Services Provided

The services we provided during this project

Project Management
Free Survey & Consultation
Bathroom Design
Bathroom Supply
Bathroom Fitting (Install)

Like what you see?