About The Project

The client approached Invicta Bathrooms wanting to modernise a dated bathroom that still relied on old-style boxing, fixtures and fittings. The brief was clear: remove the existing bath entirely and replace it with a spacious shower, creating a cleaner, more contemporary layout.

Working to a project budget of £14,000, the finished installation came in at £13,456, using the Chincho bathroom range throughout. The scope covered tiles, furniture, radiators, showers and taps, and lighting, giving the client a fully coordinated finish rather than a piecemeal update.

The project was completed within 3 weeks, with the client kept informed at every stage of the design and installation journey.

This is what the bathroom looked like before

The Process & The Bathroom Design & Build In Progress

An electrician and bathroom fitter worked together throughout the project. The quote included LVT flooring, an overboarded and taped-and-jointed ceiling, tiling to all walls, a new toilet and sink installation, and a new electrical supply run specifically for the shower.

During installation, the team discovered the shower tray was slightly larger than the existing room dimensions. Rather than compromise on the design, an alteration was made to the wall to ensure the tray fitted correctly, keeping the project on track without cutting corners.

The client received daily updates throughout the works and was kept closely involved in progress. A small issue arose towards the end of the job, which was resolved to the client’s full satisfaction. More examples of finished bathrooms like this can be seen in the project gallery.

Here you can see the work involved and what the space looked like as things progressed.

Download Our Brochure.

View our Ranges

The Results

The result is a high-quality, futureproofed bathroom that removes the maintenance and space demands of an old bath in favour of a practical, modern shower.

  • Old boxing and outdated fixtures completely removed
  • Bath replaced with a dedicated walk-in shower
  • New LVT flooring for a durable, low-maintenance finish
  • Ceiling overboarded, taped and jointed for a smooth surface
  • Full wall tiling throughout the room
  • New toilet and sink installed as part of the refit
  • Dedicated new electrical supply fitted for the shower
  • Delivered within 3 weeks with daily progress updates
Close view of the new walk-in shower in an Ashford bathroom, showing marble-effect tiles, glass screen and electric shower fitting

Everton, was a lovely chap, worked extremely hard in fitting my bathroom and always cleaned up after himself. Extremely happy with the outcome.

 

Inspired by this project? Contact us today to start planning your own transformation.

Sarah Elcomb

Services Provided

The services we provided during this project

Project Management
Free Survey & Consultation
Bathroom Design
Bathroom Supply
Bathroom Fitting (Install)

Like what you see?